Asphalt plant owners are able to benefit from increased use of RAP (up to 55%), energy savings (up to 35%), additional compaction for stiff mixes, extended paving season, extended paving range (over 3 hours), increased production rates, and the ability to pave over crack sealing.
Paving companies benefit from longer workability (longer hauls, less scrap), fewer emissions at the paver, additional compaction for stiff mixes, cooler working conditions (10-40 °C cooler) and the ability to extend the paving season.
How it works
Kemak’s sodium silicate fine particle size ensures an even distribution in the bitumen and its timed-release water technology maintains asphalt workability at lower manufacturing and paving temperatures.